Replacement is a building project as much as a roofing project. Understand the existing assembly, compare viable options and phase the work around access, weather and operations.

Discuss your commercial roof
Illustrative commercial low-slope roof assembly
A new roof. A considered transition.Educational low-slope model · actual scope depends on the roof system

1 / 6 · The process

Assess the existing roof

Review roof history, layers, drainage and concealed moisture investigation.

Why it matters

The existing condition determines the viable options.

Explore the stages or pause to read.
Talk with our team · (512) 910-4110

The commercial details

Plan around the building.

Recover vs replacement

A recover is conditional on moisture, substrate, existing layers, code and system eligibility. It is not an automatic alternative.

Phasing

Discuss noise, odors, loading, parking, tenant access and weather protection before mobilization.

Decision records

Compare scope, exclusions and lifecycle obligations alongside price.

Before work begins

Clear scope.
Coordinated work.

Confirm the roof system, site access, authorized decision-makers and the work included. Agree on protection, staging, tenant communication, cleanup and documentation.

Plan the next step

Ask for the project-specific details

  • Observed conditions, testing limits and agreed investigation.
  • Materials, attachment and manufacturer requirements.
  • Access, fall protection, equipment and occupant coordination.
  • Permits, inspections and design responsibilities where applicable.
  • Pricing, exclusions, changes and written warranty terms.

Before you decide

Questions worth asking.

Can a new roof go over the existing roof?

Sometimes a recover is suitable, but existing layers, moisture, condition and applicable requirements must be evaluated first.

How long will replacement take?

Area, access, removal scope, weather, equipment and the chosen system affect the schedule. Confirm the project-specific plan.