1 / 6 · The process
Assess the existing roof
Review roof history, layers, drainage and concealed moisture investigation.
Why it matters
The existing condition determines the viable options.
Commercial · Austin & Central Texas
Replacement is a building project as much as a roofing project. Understand the existing assembly, compare viable options and phase the work around access, weather and operations.

1 / 6 · The process
Review roof history, layers, drainage and concealed moisture investigation.
The existing condition determines the viable options.
2 / 6 · The process
Set work areas, material handling, occupant protection and daily weather plans.
Removal should be coordinated with the building’s operations.
3 / 6 · The process
Remove material within the approved scope and inspect the exposed substrate.
Wet or deteriorated material needs an appropriate response.
4 / 6 · The process
Complete approved substrate repairs and install the specified insulation and cover board.
The new roof needs a sound foundation.
5 / 6 · The process
Install the membrane and integrate drains, curbs, penetrations and edges.
A continuous system protects the spaces below.
6 / 6 · The process
Review inspections, completion records, maintenance needs and written warranty terms.
The handover sets up the next lifecycle.
Explore the stages or pause to read.
Talk with our team · (512) 910-4110
The commercial details
A recover is conditional on moisture, substrate, existing layers, code and system eligibility. It is not an automatic alternative.
Discuss noise, odors, loading, parking, tenant access and weather protection before mobilization.
Compare scope, exclusions and lifecycle obligations alongside price.
Before work begins
Confirm the roof system, site access, authorized decision-makers and the work included. Agree on protection, staging, tenant communication, cleanup and documentation.
Plan the next stepBefore you decide
Sometimes a recover is suitable, but existing layers, moisture, condition and applicable requirements must be evaluated first.
Area, access, removal scope, weather, equipment and the chosen system affect the schedule. Confirm the project-specific plan.