Skip to content
Explore Texas Professional Roofing

Austin & Central Texas

Commercial roof systems
A dependable roof for the work below.

Compare commercial roofing systems around your property, access needs, drainage, and the decisions your team needs to make.

Questions about your roof?
Roof Replacement – Dental Office completed by Texas Professional Roofing
Texas Professional Roofing projectSee the work
  1. 01

    Assess the property

    Review condition, access, drainage, and business priorities.

  2. 02

    Define the system

    Compare repair and replacement paths in writing.

  3. 03

    Plan the work

    Coordinate a clear scope around the people and place it protects.

Details that make a difference

Match the assembly to the building.

Roof slope, structural capacity, drainage, equipment, and building use narrow the options before color or price. Compare the entire assembly, including insulation, attachment, edges, penetrations, and maintenance access.

Asphalt roofing

Steep-slope asphalt shingles provide a dimensional finish on offices and other buildings with pitched roofs. Low-slope asphalt systems, including modified bitumen and built-up roofing, use different assemblies and installation details. Specify the system suited to the actual slope.

Single-ply membranes

TPO, PVC, and EPDM are membrane families used on low-slope roofs. Seam construction, chemical exposure, attachment method, insulation, and substrate compatibility differ. Roof-mounted equipment and service traffic also affect the specification and protection needed.

Metal roof systems

Standing-seam and exposed-fastener systems suit different building designs. Panel length, thermal movement, coating, fastening method, roof pitch, and edge details all matter. Identify the exact panel and its installation requirements in the proposal.

Clay tile, concrete tile, and slate

These materials can provide a distinctive steep-slope finish, but the structure must be suitable for the specified load. Underlayment, fastening, flashing, and replacement access deserve as much attention as the visible roof covering.

Questions before you begin

Can a new roof cover be installed over the existing roof?

That requires an assessment of existing layers, moisture, deck condition, structural capacity, applicable requirements, and the proposed manufacturer system. A recover is not appropriate when it would conceal unresolved wet or damaged materials.

What belongs in a commercial system comparison?

Compare the same roof area and scope: tear-off or recover, deck allowances, insulation, drainage corrections, membrane or panels, perimeter details, penetrations, access, disposal, maintenance, and written warranty terms.

Work you can see

Real roofs. Specific solutions.

Explore all roofing projects

A clear next step

Understand the roof before choosing the work.

Tell us what you’ve noticed

Start with the property location, leaks or damage, and your priorities. Call during office hours to discuss availability.

Inspect and explain

Talk through visible conditions, repair or replacement options, and anything that needs further investigation. Confirm access and inspection scope with the team.

Agree on the scope

Review the proposed materials, work, cleanup, price and written coverage before deciding. An enquiry is the beginning, not a commitment to replace your roof.

Open the roof project checklist